Project Documents


Consider supplemental water project addendum Environmental Impact Report for the elimination of the Phase III
additional 18-inch parallel waterline 4/25/12

BACKGROUND 3) the upsizing of the currently proposed Phase 1 pipeline extension adjacent to Blosser Road from 18 to 24 inches and elimination of the Phase III additional 18-inch parallel waterline or replacement 24-inch waterline.

Staff letter on Draft Benefit Assessment Channges 2/24/12

Staff letter on Draft Assessment report 2/24/12

Draft Assessment report with out list of parcels, NCSD 2/24/12

Draft NCSD Assessment Map, NCSD 2/24/12

Draft GSWC Assessment Map, NCSD 2/24/12

Draft RWC Assessment Map, NCSD 2/24/12

Draft WMWC Assessment Map, NCSD 2/24/12

Draft Ballot, NCSD 2/24/12

 

Public Relations Contract increase approval, NCSD 4/27/11 Item E1 Minutes contract extension in the amount of $74,879

Public Relations Campaign: Supplemental Water Polling Conducted February 2011 Results, True North 5/11/11, Item C5

Board packet, Pole shows an "Definitely+Probably Yes" rate of 28%, an "Definitely+Probably No" rate of 61% (p3)

 

Public Relations Presentation on "Public Outreach", True North 8/2/10

Public Relations Contract approval, NCSD 3/24/10 Item E1 Minutes work not-to-exceed $76,000

Public Relations Contract approval, NCSD 3/24/10 Item E1 board packet

 

WIP Narrative Report, AECOM 9/2009, 4mb

WIP Concept Design Report Volume1, AECOM 4/2009, 11mb

WIP Concept Design Report Volume2, AECOM 4/2009, 14mb

WIP Concept Design Report Volume3, AECOM 4/2009, 8mb

WIP Final Environmental Impact Report, Wood & Associates 3/2009, 19mb

WIP Additional Comments to Final EIR V1, Wood & Associates 3/2009, 5mb

WIP Additional Comments to Final EIR V2, Wood & Associates 3/2009, 5mb

WIP Additional Comments to Final EIR V3, Wood & Associates 3/2009, 8mb

WIP Final EIR Part1 section I to IV, Wood & Associates 3/2009, 5mb

WIP Final EIR Part1 Page V1 to 53, Wood & Associates 3/2009, 5mb

WIP Final EIR Part1 Page V54 to 86, Wood & Associates 3/2009, 2mb

WIP Final EIR Part1 Page V87 to 109, Wood & Associates 3/2009, 2mb

WIP Final EIR Part1 Page V110 to 144, Wood & Associates 3/2009, 3mb

WIP Final EIR Part1 section VI to XI, Wood & Associates 3/2009, 4mb

WIP Draft EIR Comments made 1/24/09

WIP Draft EIR Comments made 1/9/09

WIP Draft EIR, Wood & Associates 11/2008, 8mb

WIP Notice of Completion of Draft EIR, 11/2008, 8mb

WIP EIR Initial Study, Wood & Associates 6/2008, 9mb

WIP Notice of Preparation for Draft EIR, 6/25/2008, 1mb

WIP Preliminary Engineering Memorandum, 5/2008, 22mb

The Appendices are available for review at the NCSD District Office during regular business hours (Monday-Friday  8:00 a.m. to 4:30 p.m.)

Evaluation of Supplemental Water Alternatives Technical Memorandum No. 3 Implementation of Water Supply from CCWA/State Water Pipeline, 11/30/2007, 1mb

Evaluation of Desalination as a Source of Supplemental Water-Administrative Draft Technical Memorandum 2, 9/28/2007, 2mb

Draft Evaluation of Supplemental Water Alternatives, Tech Memo No. 1, Constraints Analysis Part 1, Boyle Engineering 6/1/2007, 9mb

Draft Evaluation of Supplemental Water Alternatives, Tech Memo No. 1, Constraints Analysis Part 2, Boyle Engineering 6/1/2007, 5mb

Draft Evaluation of Supplemental Water Alternatives, Tech Memo No. 1, Constraints Analysis Part 3, Boyle Engineering 6/1/2007, 5mb

Draft Evaluation of Supplemental Water Alternatives, Tech Memo No. 1, Constraints Analysis Part 4, Boyle Engineering 6/1/2007, 5mb

Draft Evaluation of Supplemental Water Alternatives, Tech Memo No. 1, Constraints Analysis Part 5, Boyle Engineering 6/1/2007, 8mb

Draft Nipomo Water Line Intertie Project Preliminary Engineering, Boyle Engineering 11/2006

The entire document may be reviewed at the District Office during regular business hours (M-F 8:00 a.m. to 4:30 p.m.) or at the Nipomo Public Libary.  You may obtain a copy of the report on CD free of charge or purchase the document for $70.50 at the District Office.

Due to the size of the document, NCSD is unable to post it on the web site at this time.

 

WIP Objectives, 4/12/2006, 12kb

2006 WIP FAQ that set a cost of $7.5million to $9.5 million and basis of the $13,200 cost for the county imposed "in-Lieu Fee"

WIP Feasibility Study-Santa Maria River Crossing Alternatives, Cannon Associates 3/1/2005, 18mb

WIP Memorandum of Understanding (MOU) between Santa Maria and NCSD, 3/1/2004, 51kb

 

 

 

 

Direct links to NCSD website copies. (many of these are do not have searchable or cut and paste text and may be larger in size)

Narrative Report (prepared by AECOM, dated August 2009)

Concept Design Report (prepared by AECOM, dated April 2009)

Volume 1, Volume 2 and Volume 3

Comments on EIR

Part 1, Part 2 and Part 3

Final Environmental Impact Report (prepared by Douglas Wood & Associates, Inc. dated March 2009)  The report is large and broken into parts.

Part 1 (Pages I-1 to IV-6)

Part 2 (Pages V-1 to V-53)

Part 3 (Pages V-54 to V-86)

Part 4 (Pages V-87 to V-109)

Part 5 (Pages V-110 to V-144)

Part 6 (Pages VI-1 to XI-57)

 Draft Environmental Impact Report (prepared by Douglas Wood & Associates, Inc. dated November 2008)  (Please note:  this document is large and may take extra time to upload to your computer)

Comments may be submitted to Nipomo Community Services District by 4:00 p.m. on Friday, January 9, 2009.

Notice of Completion of Draft EIR (dated November 2008)

Waterline Intertie Initial Study (prepared by Douglas Wood & Associates, Inc. dated June 2008)

Notice of Preparation of a Draft Environmental Impact Report (dated june 25, 2008)

Nipomo Waterline Intertie Project - Preliminary Engineering Memorandum (dated May 2008)

The Appendices are available for review at the NCSD District Office during regular business hours (Monday-Friday  8:00 a.m. to 4:30 p.m.)

Evaluation of Supplemental Water Alternatives Technical Memorandum No. 3 Implementation of Water Supply from CCWA/State Water Pipeline (dated November 30, 2007) 

Evaluation of Desalination as a Source of Supplemental Water-Administrative Draft Technical Memorandum 2 (dated September 28, 2007) 

Draft Evaluation of Supplemental Water Alternatives - Technical Memorandum No. 1 Constraints Anaylisis (dated June 2007, prepared by Boyle Engineering)

Part 1  Part 2  Part 3  Part 4  Part 5 

Draft Nipomo Waterline Intertie Project-Preliminary Engineering Memorandum (dated November 2006, prepared by Boyle Engineering)

The entire document may be reviewed at the District Office during regular business hours (M-F 8:00 a.m. to 4:30 p.m.) or at the Nipomo Public Libary.  You may obtain a copy of the report on CD free of charge or purchase the document for $70.50 at the District Office.

Due to the size of the document, NCSD is unable to post it on the web site at this time.

Objectivesof the Supplemental Water Pipeline, (approved on April 12, 2006)

Waterline Feasibility Study-Santa Maria River Crossing Alternatives  (prepared by Cannon Associates dated March 2005)

Memorandum of Understanding By and Between the City of Santa Maria and Nipomo Community Services District (dated September 2004)